Hasaka, Turkish occupation continued its attacks on infrastructure and service facilities in Hasaka countryside and targeted the power plant in Suwaidiyah with drones, causing it to be out of service.
The Director General of the Hasaka Electricity Company, Engineer Saleh Idris affirmed that the power plant in Suwaidiyah was out of service as a result of a Turkish aggression with drones on Monday, caused serious material damage to the facility’s generating turbines.
Field source told SANA that Turkish occupation drones attacked the facility with six air strikes.
Source: Syrian Arab News Agency